Optimize Your Business Today!
Own your cost truth
Don’t Settle For Less
No black box, no guessing.
Costonomics builds deterministic, traceable cost tools for industrial and mining projects.
ShouldCost, the AACE-native estimating engine, prices your scope from cited references: CAPEX, OPEX and TCO, with the accuracy range built into every result.
Every number cites its source, every assumption is flagged and numbered — and when the data cannot support a number, the engine refuses rather than guesses.
Charge Forward
Understand the cost mechanics
Start with the free public calculators — published open models with the AACE Class 5 range built in — and the free AACE maturity self-assessment.
When the stakes rise, the same engine scales to the full platform — on your infrastructure, with your own cost data as the third simulation level.
One platform, four roles
Design office, estimator, project manager and buyer work on the same cost referential — role profiles scope what each one sees, and every project feeds your cost capital.
For Design Offices
A defendable number — without a dedicated estimator: equipment list in, should-cost out in minutes. BOM take-off, factored bulks, the AACE range built into the result — and the design-office profile works without vendor prices.
For Estimators
Your backbone, not your replacement: full AACE discipline — three data levels, every line explained and cited, versions diffed, parallel scenarios on one reference. The engine does the bookkeeping; you keep the judgement.
For Project Managers
Pass the gate with evidence: the AACE class determined from your deliverables — not declared — P10\/P50\/P90 with S-curve phasing, FTE staffing, scenario verdicts. The milestone file, ready for the review.
For Procurement
Negotiate at should-cost: supplier packs that never leak an internal price, multi-quote bid tabulation with a recommended mix, private observed-price memory, contractual index revision.
From Our Founder
Every number must defend itself
Costonomics is built for the people who sign the cost section — estimators, design offices, project managers and buyers. Every line cites its source, assumptions are numbered, and the AACE accuracy range is part of the answer, never an afterthought.

