Calculators / AACE estimate class self-assessment
Free self-assessment — AACE RP 18R-97 logic

AACE estimate class self-assessment

Don't declare your estimate class — determine it. Score each project-definition deliverable as it stands today; the weighted definition percentage and the per-class gate deliverables give the class you can defend, with its RP 17R-97/18R-97 accuracy range and representative contingency. Everything runs in your browser.

General
Project scope statement / design basisweight 8
Project execution / contracting planweight 5
Project master scheduleweight 4
Process
Block flow diagramsweight 5
Process flow diagrams (PFDs)weight 10
Utility flow diagrams (UFDs)weight 5
Piping & instrumentation diagrams (P&IDs)weight 12
Heat & material balancesweight 8
Layout
Plot plansweight 7
General equipment arrangement drawingsweight 6
Mechanical
Process equipment datasheetsweight 9
Utility equipment datasheetsweight 5
Mechanical discipline drawingsweight 5
Engineering
Specifications & datasheets (all disciplines)weight 8
Material take-offs (MTO) / bulk quantitiesweight 8
Electrical
Electrical (single lines, discipline drawings)weight 5
I&C
Instrumentation & control drawings (loop, index)weight 5
Civil
Civil / structural / site drawingsweight 4

Method & honesty notes

Screening is level 1. Negotiation needs level 2.

This free tool runs on published, citable models — order-of-magnitude by design (AACE Class 5). The Costonomics engine adds market-calibrated cost books, OPEX & TCO, and full AACE traceability.

Explore the costing engine